View Single Post
Old 10-10-2017, 11:29 AM   #6
sc00ter   sc00ter is offline
 
Join Date: May 2017
Location: Norfolk, VA
Posts: 513
The port polishing and matching is in Moped Armys Wiki page, under tuning. We can build a full motor in about a day total=24 hours. This is NOT counting splitting the cases and cleaning/prepping for the build. Beer and loud music tends to slow things down sometimes. Also we always end up misplacing something dumb like the upper con-rod bearing or discover that the case sealant (We use red Dirko) has dried up since the last build. There are also some good how-to videos on YouTube.
  Reply With Quote